
— VIDEO
Footage from the site
Repair of bridge G52 over the Răut river (2020) — upgrading bridge infrastructure on a regional corridor.
The works were executed in accordance with the specifications and applicable technical standards, with on-site quality control and in our own laboratory.
IRINDA PRIM equipment and qualified personnel ensured compliance with deadlines and technical parameters agreed with the beneficiary.
Project gallery
— LOCATION
Where the project takes place
Răut